地下水学会誌
Online ISSN : 2185-5943
Print ISSN : 0913-4182
ISSN-L : 0913-4182
谷田部試験地における雨水浸透工法の機能評価
吉野 文雄田子 秀徳細谷 信夫
著者情報
ジャーナル フリー

1987 年 29 巻 1 号 p. 27-39

詳細
抄録

Land development changes runoff characteristics, and it usually makes floods larger. To deal with larger flood, flood control facilities must be constructed, when the river don't have capacity for larger discharge. One of flood control facilities is a storage facility of rainfall, retarding basin, and other is a infiltration facility of rainfall, drainaging to underground by infiltration.
The former reduces pea k discharge, but cannot reduce runoff volume. And covering large area isn't effective from the developing point of view.
The latter doesn't only reduce peak discharge for in f i ltration rate, but also reduces runoff volume and recharges groundwater. It makes effective land use possible because it is constructed under ground. But it isn't sure quantitative effect and its life.
Yatabe experimental field was established in Tsukuba Science City to study runoff changes due to development and to evaluate infiltration facilities. This is a report on evaluation of infiltration facilities.

著者関連情報
© 公益社団法人 日本地下水学会
前の記事 次の記事
feedback
Top