地下階の無い鉄筋コンクリート造流通施設の工期概算式 : 建設工期の算定方法に関する研究(その1)
加藤 辰彦石丸 麟太郎末永 保美
著者情報
ジャーナル フリー

2002 年 67 巻 558 号 p. 243-250

詳細
抄録

This report explains a part of a study on the method for calculating construction period, and proposes an approximate equation to calculate the construction period of reinforced concrete distribution facilities having no basement, such as shopping centers and warehouses. This equation, being easy to use and fast to calculate, can be used as a business tool in course of sales engineering. Moreover, this equation can calculate the construction period by inputting only the total floor area of a building. We have confirmed the reliability of this equation by a statistical test. Some equations and softwares needed to calculate construction period are made public and can be accessed on the internet. However, users need special knowledge of the technology of construction to use these equations and softwares. Besides, there is no report of testing the reliability of results of calculating construction period by these equations and softwares.

著者関連情報
© 2002 日本建築学会
前の記事 次の記事
feedback
Top