Concrete Research and Technology
Online ISSN : 2186-2745
Print ISSN : 1340-4733
ISSN-L : 1340-4733
Proposal of Method of Selecting Structure that should be inspected by Priority based on Repair-Risk
Yoshitaka KatoTaketo Uomoto
Author information
JOURNAL FREE ACCESS

2005 Volume 16 Issue 2 Pages 101-107

Details
Abstract

In this paper, in order to evaluate the influence of dispersion of quality of concrete cased by construction errors on the maintenance management of concrete structure quantitatively, Repair-Risk was proposed. Repair-Risk was calculated by using the prediction result of deterioration of concrete structure considering with the dispersion of quality of concrete and the risk curve of repair cost. Even when two or more structures should be managed, the inspection plan (selection of inspection item, evaluation of the effect of accuracy of inspection method and selection of structure) can be made by using proposed method.

Content from these authors
© Japan Concrete Institute
Previous article Next article
feedback
Top