Potential for and feasibility of small hydropower generation at headworks in Japan
Fenglan WangKeigo NodaIssaku AzechiMasateru Senge
著者情報
ジャーナル オープンアクセス

2020 年 14 巻 1 号 p. 23-28

詳細
抄録

In this research, power generation potential is estimated using overflow discharge for eight headworks (Inuyama, Meiji-yousui, Muromatsubara, Kansakawa, Furikusa, Onyu, Hosokawa and Okajima) located in Aichi and Gifu Prefectures, and the characteristics of their power generation are clarified in order to evaluate the feasibility of small hydropower plants. The results are as follows. Firstly, overflow discharge is more stable than the discharge of intake water at the headworks, which suggests that power generation using overflow discharge is more suitable for actual power generation. Secondly, maximum power outputs of 43 kW to 2,002 kW, under a discharge utilization factor of 60%, show great potential for power generation at these eight headworks. Finally, fluctuations in monthly power generation are higher than that of annual power generation due to the influences of irrigation and seasonal changes in precipitation on water intake.

著者関連情報
© 2020 The Author(s) CC-BY 4.0 (Before 2017: Copyright © Japan Society of Hydrology and Water Resources)
前の記事 次の記事
feedback
Top