IEEJ Transactions on Industry Applications
Online ISSN : 1348-8163
Print ISSN : 0913-6339
ISSN-L : 0913-6339
Letter
Method to Determine Emergency Stop Position of Trains to Avoid Flash Floods
Daiki OkudaTakamasa SuzukiNoriko Fukasawa
Author information
JOURNAL RESTRICTED ACCESS

2020 Volume 140 Issue 6 Pages 497-498

Details
Abstract

In recent years, local intense rainstorms that are difficult to predict until just before the occurrence (about 30 min before) have been occurring more frequently, resulting in a higher risk of trains being interfered with, or even caught in a flash flood. This paper introduces a method to determine the optimal stopping position for trains to avoid such flash floods, with a reasonably fast mathematical optimization calculation. The method provides decision makers with informative solutions applicable to train operations on a quantitative basis when a local intense rainstorm is predicted.

Content from these authors
© 2020 by the Institute of Electrical Engineers of Japan
Previous article Next article
feedback
Top