2020 Volume 140 Issue 12 Pages 851-857
Using the current injection method, how to calculate the transient recovery voltages in three-phase asymmetrical current interruption in analysis has been devised. This calculation is applicable to both effectively earthed neutral system and non-effectively earthed neutral system. Since the transient recovery voltages of three-phase test duty T100a are calculated, the performance of the circuit breaker in three-phase asymmetrical current interruption can be estimated more correctly in synthetic testing.
The transactions of the Institute of Electrical Engineers of Japan.B
The Journal of the Institute of Electrical Engineers of Japan