2016 Volume 10 Issue 4 Pages 632-638
Multinational corporations produce products at relatively few factories and then sell those products in all areas of the world. Longer lead times increase the risk of fluctuations in product demand. To reduce this risk, the entire business chain, from production to sale, must be optimized. In this study, we propose, implement, and verify a total optimization system. This system uses multi-agent simulation on big time series data. It consists of management, integrated database, and operation modules.
This article cannot obtain the latest cited-by information.