International Journal of the JSRM
Online ISSN : 2189-8405
The effectiveness of automated angle control system to reduce the overbreak for excavation by blasting
Tsuyoshi FUKUDATakumi ARAIRyota TAKASHINOHiroyuki OTSUBOKousuke KAKIMIMasahiro OKUBOYohei YAMAGUCHIRyo OKAWAKeita YAMABE
著者情報
ジャーナル オープンアクセス

2019 年 15 巻 1 号 p. 21-23

詳細
抄録

Currently, the high demands and needs to improve productivity and labor-saving in construction industries leads to many automation and mechanization. This report aims to address the shortage of skilled worker in the future as well as improvement of safety, productivity and quality. Comprehensive collection and utilization of information were carried out and with target to eliminate the over reliance of experience worker in mountain tunneling, “Auto-mated Angle Control System” technology was developed to reduce the overbreak of tunnel during excavation. The concept of this method is to ensure that the productivity of drilling for blasting operation will not be influenced by the worker skills. This system was tested in Shin-Tomei Expressway Takatoriyama west tunnel construction project and results confirmed that the system successfully minimized the over-break of tunnel during excavation. We hope that this report will contribute to the improvement of safety and productivity.

著者関連情報
© 2019 Japanese Society of Rock Mechanics
前の記事
feedback
Top