Host: ITE
In the product development, we must use the limited H/W resource efficiently. If we can understand the timing of the resource occupation accurately in each function, we can resolve resource shortage problem in the design stage. However, the allotment of the resource is very hard and causes trouble by the design error when we develop the large-scale S/W. Moreover, we cannot resolve resource shortage problem in the design stage beforehand when we use the resource of the external instrument. In addition, the method of evading resource shortage in the design stage has the problem of weakening the merit of S/W sharing. Therefore, we report on the method for the dynamic resource conflict resolution, and explain the simulation of the resource conflict resolution.