地下水学会誌
Online ISSN : 2185-5943
Print ISSN : 0913-4182
ISSN-L : 0913-4182
水質の多変量解析によるロックフィルダム漏水経路の診断
(その2) 第3回湛水時における調査結果について
中島 重旗下津 昌司塩崎 功北村 孝海向上 拡美
著者情報
ジャーナル フリー

1989 年 31 巻 1 号 p. 19-30

詳細
抄録

A groundwater investigation performed before and after filling the reservoir to study the characteristics of groundwater quality at the rock fill dam two years form initial filling.
The results were as follows:
(1) Variation in groundwater quality before and after filling the reservoir became smaller than that of initial filling due to seepage from the reservoir into the rock for two years.
(2) Small variation in groundwater quality could be expressed clearly by the principal component analysis basd on the water quality.
(3) When the variation in groundwater quality is large, we can estimate the flow routes of seepage by electric conductivity of groundwater.
(4) In this area, investigating groundwater quality after 3 or 4 months froms the start of filling is effective for clarifing the variation in groundwater quality.

著者関連情報
© 公益社団法人 日本地下水学会
前の記事 次の記事
feedback
Top