The deposits of Minami Kanto gas field is very thick and reserves amout of methane and iodine. Production wells are completed with long perforated pipes. Most of these wells are tubingless and the artificial lift method is continuous gas lift.
I have developed a simulator which is formed with a three dimensional, two-phase double porosity reservoir model and a gas lift program. Using this simulator, production rates of wells can be predicted and production tests are analized exactly.