石油技術協会誌
Online ISSN : 1881-4131
Print ISSN : 0370-9868
ISSN-L : 0370-9868
カンボジアにおける海洋掘削リグのアサイメント契約について
佐々木 芳朗
著者情報
ジャーナル フリー

1997 年 62 巻 5 号 p. 416-420

詳細
抄録

Cambodia Petroleum Exploration Co., Ltd. (CAMPEX) drilled its third exploratory well named “Poulo Wai-1” in August 1996 in the Block III of Offshore Cambodia. In order to select a drilling rig, CAMPEX studied the two contract systems: an Assignment/Reassignment Agreement system (“Assignment”) and a Tender system. It was concluded that “Assignment” was more cost effective than a Tender on this particular well after a series of negotiation with Enterprise Oil Exploration Ltd. (Enterprise). CAMPEX decided to adopt “Assignment” and acquired a drill ship. The main points of the agreement were that CAMPEX was assigned the right and the duty of one option well from the original agreement made by Enterprise and that CAMPEX shared a mobilisation and a demobilisation cost of the rig, a rig modification cost and a time-writing cost with Enterprise. For the sake of the adoption of “Assignment”, CAMPEX saved the total well cost significantly.

著者関連情報
© 石油技術協会
前の記事 次の記事
feedback
Top