Journal of Japan Industrial Management Association
Online ISSN : 2187-9079
Print ISSN : 1342-2618
ISSN-L : 1342-2618
Machine-Fixed, Machining-Assembly Flow Shop Scheduling
Xi SUNAkira NISHIURAKazuko MORIZAWAHiroyuki NAGASAWA
Author information
JOURNAL FREE ACCESS

1999 Volume 50 Issue 5 Pages 283-289

Details
Abstract

In this paper effective heuristics are proposed for minimizing makespan in machine-fixed, machining-assembly flowshop scheduling, where parts of each job are machined on prespecified parallel machines in the machining stage and then assembled in the assembly stage after all component parts are been completed. Since this problem in NP-complete, several heuristics have been proposed so far by converting the original problem into the usual two-machine flowshop problem which can be solved through Johnson's algorithm. However, the tight upper boundaries for the relative error in these heuristics are very large, i.e., 50〜100%. The heuristics proposed in this paper exploit the basic idea of Johnson's rule, Gupta's idea and the results of worst/difficult case analyses without any conversion of the original problem into the usual two-machine flowshop problem. Numerical experiments showed that the proposed heuristics can efficiently solve all problems generated randomly for the two parallel-machine case, and can solve more than 99.0 percent of the problems for three and five parallel-machine cases. These heuristics are superior to the usual branch and boundary algorithm with a limited computation time of 30 minutes, not only in efficiency but also in accuracy.

Content from these authors
© 1999 Japan Industrial Management Association
Previous article Next article
feedback
Top