精密工学会誌
Online ISSN : 1882-675X
Print ISSN : 0912-0289
ISSN-L : 0912-0289
論文
リエントラントフローショップスケジューリング問題に関する研究(第1報)
数理計画法による最適化
樋野 励上川 大輔森川 正憲鈴木 教和社本 英二
著者情報
ジャーナル フリー

2008 年 74 巻 10 号 p. 1119-1124

詳細
抄録

A new theoretical formulation for re-entrant flow shop scheduling problem is derived to plan an optimum production schedule by mixed integer programming. Flow time, which is an index of the evaluation of the planned schedule, is minimized to decrease amount of work-in-process. Cycle time, which is another important index, is determined by the total load time on a bottleneck machine to manufacture the products at the highest productivity. Both objective function and constraint conditions are described in linear expressions and a general optimization tool is adopted to solve the formulated scheduling problems. Another objective function is also introduced in order to shorten the time for the optimization. Computational scheduling results obtained by the optimization are evaluated and discussed in the present paper.

著者関連情報
© 2008 公益社団法人 精密工学会
前の記事 次の記事
feedback
Top