Abstract
In this study, a new type scheduling model for designing desirable construction planning and scheduling efficiently is developed especially for the purpose of obtainig method of an outline scheduling plan. In this planning model rationality in modeling phenomenon and objective function to the purpose of planning is tried to keep in good balance between them with good operationality.
The hybrid scheduling model of construction project combining with simulation model and optimization model is developed to obtain such goal as stated above. A practical case study to this model is discussed by applying in construction planning of the actual large-scale tunneling project.