Journal of MMIJ
Online ISSN : 1884-0450
Print ISSN : 1881-6118
ISSN-L : 1881-6118
論文  -【特集】武甲山における石灰石採掘と残壁管理-
武甲山残壁の表面変位のモニタリング
中谷 剣藤巻 宏太平澤 祐介秋山 文孝宮弓 泰輔田中 恭平
著者情報
ジャーナル オープンアクセス

2018 年 134 巻 11 号 p. 170-178

詳細
抄録

This study examines reliable methods to monitor and manage the stability of a limestone rock slope. The surface displacement of the rock slope of Mt. Buko has been measured over the past 20 years, employing several tools and methods including automated polar system (APS), global positioning system (GPS), and leveling. The rock slope of Mt. Buko will eventually reach gigantic proportions; it will be 800 m high × 5 km long at the end of mining operations. Monitoring work was often associated with data that oscillated irregularly due to negative influences from environmental factors such as temperature, atmospheric pressure, and humidity. However, APS measurements have provided the less fluctuation data by calculating differences in slope distance. The differences in slope distance are obtained by subtracting the slope distance at a reference point in the least displaced area from those at other points. GPS measurements have provided baseline analysis data by setting the reference point in the least area. The GPS data can be converted into slope distance and compared with APS data, and the result of this has shown there are no discrepancies between two types of data. Employing APS and GPS has enabled highly accurate monitoring that produced reliable data due to cross comparisons of each data source.

著者関連情報
© 2018 The Mining and Materials Processing Institute of Japan

この記事はクリエイティブ・コモンズ [表示 - 非営利 - 改変禁止 4.0 国際]ライセンスの下に提供されています。
https://creativecommons.org/licenses/by-nc-nd/4.0/deed.ja
前の記事 次の記事
feedback
Top