Doboku Gakkai Ronbunshu
Online ISSN : 1882-7187
Print ISSN : 0289-7806
ISSN-L : 0289-7806
ESTIMATION OF THE THRUST IN PIPE JACKING WITH INNER EXCAVATION SYSTEM AND THE METHOD TO CUT DOWN ITS VALUE
Sadao TAKESHITA
Author information
JOURNAL FREE ACCESS

1985 Volume 1985 Issue 364 Pages 239-248

Details
Abstract
Japanese National Railways developed a new construction method of an underpass beneath the railway banking using a horizontal pipe jacking in 1976. But in earlier time, it was one of important problems to estimate its thrust when one wants to carry out this work. Thereafter, the author found that the thrust depends upon the characteristics of the ground, the shape of an element to be jacked, that of a cutter head and so on, proposed a formula to estimate this value and proved its practicability comparing the estimated value with that measured. The author also carried out the experiments to find out the effects of a few conventional methods to cut down the thrust on this construction method quantitatively and succeeded to enlarge the jacking length.
Content from these authors
© by Japan Society of Civil Engineers
Previous article Next article
feedback
Top