Journal of Japan Society of Civil Engineers, Ser. D3 (Infrastructure Planning and Management)
Online ISSN : 2185-6540
ISSN-L : 2185-6540
Infrastructure Planning and Management Vol.28 (Special Issue)
ESTIMATING TIME REQUIRED FOR SHIP BERTHING AND QUAY CRANE WORKING WITH CONSIDERING TYPES OF MACHINE
Etsuko NISHIMURALiying CHEN
Author information
JOURNAL FREE ACCESS

2011 Volume 67 Issue 5 Pages 67_I_869-67_I_878

Details
Abstract
There has been shown to be a tendency towards great numbers of the container throughput as the world trade expands. Mega-containerships with the capacity of over 10,000 TEU are mainly serviced between Asia and Europe. Even now the number of ports where mega-containerships call has been almost same as conventional size ships. However, in the future, the effect on introducing mega-containerships will become apparent. At a terminal where mega-containerships are calling, most cargoes to be handled are transshipments from origin to destination ports via that terminal. There are the scheduling problems in order to optimize quay space use and yard space use, those need the time required for ship berthing and quay crane working, it is difficult for us to acquire the information under the situation in actual port terminal. Thus, in this study, we construct the simulation models by types of machine, obtain the time and the factors influenced to that time from these results. This paper develops the models that estimate the time required for ship berthing and quay crane working.
Content from these authors
© 2011 Japan Society of Civil Engineers
Previous article Next article
feedback
Top