JSME international journal. Ser. 2, Fluids engineering, heat transfer, power, combustion, thermophysical properties
Print ISSN : 0914-8817
Wakamatsu High-Temperature Turbine Verification Test Project : A Study of a Large-Capacity Coal-Fired USC Plant
Kasuga FURUYAAkio HIZUMETakuji FUJIKAWAHiroshi YOKOTATakatomo KOKUBUYorimasa TAKEDA
著者情報
ジャーナル フリー

1991 年 34 巻 4 号 p. 564-574

詳細
抄録
This paper reviews the design of the EPDC's Wakamatsu high-temperature turbine and the operating performance of its first-step verification test, STEP I, which features main/reheat steam temperatures of 593°C/593°C. In designing this turbine, a number of new concepts for elevated temperature use were incorporated, and several types of new heat-resistant steels were used in the major parts. Since the initial startup in November 1986, the operating performance of the Wakamatsu high-temperature turbine STEP I has so far demonstrated high reliability, and many valuable data are being obtained, proving the practicality of a large-capacity USC turbine.
著者関連情報
© The Japan Society of Mechanical Engineers
前の記事 次の記事
feedback
Top