Abstract
This paper describes the development of the requirements of conformity assessment and quality assurance which were defmed as a subsection of standard for superconducting magnet structure of ITER, Tokamak type fusion facility. In the conformity assessment rule, Role and Responsibility of Oier, Manufacturer, Constructor, Qualified Inspector, Standard-Expert Engineer were defined. The requirements of certification for Design Specification, Design Report, Manufacturing Specification, Installation Specification, Data Report were defmed as well. The quality assurance requirements consist of 18 articles, such as organization, quality assurance program, design control, document control etc. were established. Each article was designed to constitute simplified performance based requirement.