抄録
In this paper, we propose a method of capacity requirements planning (CRP) for generating robust loading plan. The proposed method determines the starting times and processing modes of production orders with the aim of minimizing the probability of overload to be occurred in the target manufacturing system. Through computational experiments, the effectiveness of the proposed method is demonstrated by comparing our method with two conventional methods.