Journal of Japan Society of Civil Engineers, Ser. B2 (Coastal Engineering)
Online ISSN : 1883-8944
Print ISSN : 1884-2399
ISSN-L : 1883-8944
Accuracy and Adequacy of "Long Swell" Forecast and Watch Model
Kouji MINAKUCHIYoshiyuki OOSHITAZenichirou MUROTomotsuka TAKAYAMAKouzou OKADAYoshihiro UTSUNOMIYA
Author information
JOURNAL FREE ACCESS

2010 Volume 66 Issue 1 Pages 146-150

Details
Abstract

"Long swell" which attacked Toyama Bay from February 23 to 24, 2008, serious damaged breakwaters at Fushiki-Toyama Port. We used the wave prediction model which considered data assimilation to predict offshore wave. And we calculated wave transformation in a shallow water using Boussinesq-type wave transformation model (NOWT-PARI for short). We combined these both of them and built the prediction model of "Long Swell" at Fushiki-Toyama Port. To improve the precision of the made prediction model of "Long Swell", we built the wave watch system. We showed that a prediction of "Long-Swell" is possible to use wave prediction model and a wave watch system.

Content from these authors
© 2010 Japan Society of Civil Engineers
Previous article Next article
feedback
Top