作業者の位置情報を用いたチーム作業工程分析手法に関する研究
満行 泰河大和 裕幸稗方 和夫小林 敬和黒川 哲明
著者情報
ジャーナル フリー

2013 年 79 巻 799 号 p. 837-844

詳細
抄録

This paper proposes the methodology of analyzing the team working process using the information of factory and each worker's location. Analyzing the team working process is done through the following processes:(1) get the data of operation and each worker's location by using active RFID sensor, (2) evaluate the team working process by comparing with the representative sensor data, and (3) extract the error process automatically by using the result of evaluating team working process. The proposed methodology was applied to changing ladle operation in continuous casting. Results show that the methodology can evaluate the team working process normally and extract the unusual process which should be reported to factory manager. In addition, this method can get the new knowledge about changing ladle operation. For example, the quality of production would be poor if no worker does monitoring on pulpit.

著者関連情報
© 2013 一般社団法人 日本機械学会
前の記事 次の記事
feedback
Top