日本機械学会論文集 C編
Online ISSN : 1884-8354
Print ISSN : 0387-5024
タワークレーンの吊り荷ロープ長変動を考慮したゲインスケジュールド制御
高木 清志西村 秀和
著者情報
ジャーナル フリー

64 巻 (1998) 626 号 p. 3805-3812

詳細
PDFをダウンロード (695K) 発行機関連絡先
抄録

This paper discusses control of a crane mounted on a tower-like flexible structure in the case of varying load-rope length. A fast transfer of the load causes the sway of the load and the vibration of the flexible structure. Our object is to control both the sway and the vibration by control of torque to the boom. But if the length of the load rope varies, it is difficult to control by the fixed compensator, bacause the natural frequency of the load rope and gain of the plant to control input vary also. So, we design the gain scheduled H compensator based on the LMI for the length of the load rope and verify the efficiency of the gain-scheduled H compensator by simulations and experiments.

著者関連情報
© 社団法人日本機械学会
前の記事 次の記事
feedback
Top