PROCEEDINGS OF HYDRAULIC ENGINEERING
Online ISSN : 1884-9172
Print ISSN : 0916-7374
ISSN-L : 0916-7374
Deformation of Alternating Bars Caused by a Series of Piles
Hiroyuki TARUYA
Author information
JOURNAL FREE ACCESS

1992 Volume 36 Pages 29-34

Details
Abstract
The present study describes the deformation of alternating bars caused by a series of piles, based on the results of flume tests as well as of numerical solutions. A series of piles is composed of several piles which are straight arranged with proper separations and attack angle on the bars. The results show that alternating bars are well controlled and consequently a stream can be formed in a fixed region by placing a series of piles.
Content from these authors
© by Japan Society of Civil Engineers
Previous article Next article
feedback
Top