海洋開発論文集
Online ISSN : 1884-8265
Print ISSN : 0912-7348
ISSN-L : 0912-7348
関西国際空港2期護岸工事における沈下層厚管理について
水上 純一下川 義和播本 一正
著者情報
ジャーナル フリー

2003 年 19 巻 p. 183-188

詳細
抄録

The new airport island being constructed in the second phase is located 200m offshore from the first phase airport island. With a total area of approximately 545 hectares, the second phase airport island will require an approximately 13km extension to the seawall. The reclamation of the second phase airport island will make full use of the accumulated knowledge and technological expertise developed during the first phase construction, with the added advantages of new developments in measuring and information technologies. These will lead to minimizing the differential settlement and create a stable foundation for the airport facilities in as short a time as possible.

著者関連情報
© 社団法人 土木学会
前の記事 次の記事
feedback
Top