Software Development Effort Estimation from Unstructured Software Project Description by Sequence Models
Tachanun KANGWANTRAKOOLKobkrit VIRIYAYUDHAKORNThanaruk THEERAMUNKONG
Author information
JOURNAL FREE ACCESS

2020 Volume E103.D Issue 4 Pages 739-747

Details
Abstract

Most existing methods of effort estimations in software development are manual, labor-intensive and subjective, resulting in overestimation with bidding fail, and underestimation with money loss. This paper investigates effectiveness of sequence models on estimating development effort, in the form of man-months, from software project data. Four architectures; (1) Average word-vector with Multi-layer Perceptron (MLP), (2) Average word-vector with Support Vector Regression (SVR), (3) Gated Recurrent Unit (GRU) sequence model, and (4) Long short-term memory (LSTM) sequence model are compared in terms of man-months difference. The approach is evaluated using two datasets; ISEM (1,573 English software project descriptions) and ISBSG (9,100 software projects data), where the former is a raw text and the latter is a structured data table explained the characteristic of a software project. The LSTM sequence model achieves the lowest and the second lowest mean absolute errors, which are 0.705 and 14.077 man-months for ISEM and ISBSG datasets respectively. The MLP model achieves the lowest mean absolute errors which is 14.069 for ISBSG datasets.

Content from these authors
© 2020 The Institute of Electronics, Information and Communication Engineers
Previous article Next article
feedback
Top