システム開発プロジェクトにおける手戻りリスクを考慮したタスク優先ルール設計に関する研究
満行 泰河大和 裕幸稗方 和夫モーザー ブライアン磯沼 大岡田 伊策笈田 佳彰
著者情報
ジャーナル フリー

2016 年 82 巻 835 号 p. 15-00474

詳細
抄録

This paper proposes a methodology for designing task priority rule considering rework risk of system development project. In this paper, a process simulation considering reworks and the methodology for calculating optimal task priority rule by using genetic algorithm are developed. The process simulation considering reworks can be done by using the information of target system, rework probabilities, worker’s skill and task priority rule. Proposed task priority rule consists of several dispatching rules that are related to each task. In developed process simulation, task priority rule can define which task is done preferentially in each time. In this paper, five dispatching rules are introduced for creating proposed task priority rule. By using developed process simulation, Monte-Carlo method and genetic algorithm, optimal task priority rule can be calculated from the viewpoint of average time required of target system development project. In this paper, proposed methodology was applied to a system development project. Results show that proposed task priority rule can get the lower average time required than other dispatching rule considering the structure of workflow and rework information.

著者関連情報
© 2016 一般社団法人日本機械学会
前の記事 次の記事
feedback
Top