日本機械学会論文集
Online ISSN : 2187-9761
ISSN-L : 2187-9761

この記事には本公開記事があります。本公開記事を参照してください。
引用する場合も本公開記事を引用してください。

熱間圧延工程における燃料原単位低減を狙った加熱 - 圧延同期計画方式
堂安 豪永原 聡士智田 崇文勝部 潤一足立 透味田 悟
著者情報
ジャーナル フリー 早期公開

論文ID: 21-00142

この記事には本公開記事があります。
詳細
抄録

In order to minimize the fuel cost for heating steel ingots in hot rolling process, it is important to plan (1) batch formation to increase filling rate in furnaces and (2) work schedule to reduce stagnation of ingots in furnaces. A low filling rate increases fuel cost per ingot, and stagnation causes additional fuel cost to keep ingot’s temperature. However, the conventional divide-and-conquer methods cannot realize both high filling rate and small stagnation because of planning batch formation and work schedule sequentially. Therefore, we developed a new scheduling method that plans batch formation and work schedule simultaneously by creating multiple candidates of batch. As a result of the computational experiment, the development method reduced 12.3% fuel cost per production compared to the conventional method. The developed method has been applied to actual hot rolling line and reduced the fuel cost by 8%.

著者関連情報
© 2021 一般社団法人日本機械学会
feedback
Top