Residential co-generation systems have been introduced around Japan recently, and expected to diffuse more and more. During the process of boosting the adoption of residential co-generation systems, both manufacturers and customers are interested to know the optimal capacity of power generator for the unit, and once the unit has been installed, what dispatch strategy to use in order to minimize a customer.s cost of meeting its electricity and heat requirements.
In this paper, a mixed integer nonlinear programming model has been developed. The objective is to minimize annual cost of the energy system for a given residential customer equipped with the co-generation plant, combining with a storage tank and a back-up boiler. The model reports the optimal co-generation systems capacities that customers could employ given their electricity and thermal requirements.
Using this model, an investigation was conducted of economically optimal co-generation investment for a prototypical residential building. Furthermore, a sensitivity analysis was elaborated in order to show how the optimal solutions would vary due to changes of some key parameters. In addition, as a main component of residential co-generation systems, the optimal size of the storage tank was analyzed.
抄録全体を表示