In case of working of S. R. C. building that have 43 000 m2 total floor area and 9 meters floor hight, we adhered to the basic concrete work and have been able to prevent cold joint and rock pocket. To achieve concrete works, we evolved Q. C. circle activity and used tremie pipe chute and particular vibrater. The out line of this report are these works which could prevent cold joint and rock pocket.
The PA-NE Wall Method involves installation of precast concrete panels to form a parmanent earthquake-resistant underground wall. The temporary retaining wall constructed with this method will form a earthquake-resistant wall of high quality and precision as a part of the building when the construction work is completed. This report deals with the design and with the construction of a earthquake-resistant underground wall using precast concrete panels.
For the Precast Segment Cantilever Method with double election girder, the half area of side span, usually casting in place, was hanged from the election. girder. This constructing method is very unique and its details are reported herein.
This report describes the research, evaluation of pavement, planning, design and execution concerning the nighttime (from 10 p.m. to 7 a.m.) repair work that was in 1982 Sapporo Defense Facilities Administration Bureau replaced damaged concrete pavement panels with new prestressed concrete precast panels without interrupting the operation of Air Self-Defense Force and flight of the civil aircrafts for even a day at the middle area of main run-way of Chitose Air Base Since main run-way of Chitose A. B. paved with concrete considerably damaged by the fatigue caused by recent sharp increase of the traffic volume of super jet aircrafts, it was executed as a reinforcement counter measure.