Kitakami HiTec Paper Corp. was established by spinning off the “Kitakami Mill” from Mitsubishi Paper Mills Ltd. in 2015. From start of operations, our mill has been producing pulp from domestic hardwoods supplied mainly from Iwate Prefecture and sanitary paper and photographic base paper.
In recent years, due to the limited capital investment budget, we concentrate our effort to manufacturing cost reduction, reduction of fixed costs and the work efficiency improvement. However, we faced to the frequent shut downs of the pulp manufacturing process on our 40 years old pulp plant due to equipment accidents.
Therefore, we, together with Mitsubishi Paper Engineering Co., Ltd. which is responsible for the designing and maintenance work in the plant facilities, made a factor analysis of equipment accidents that have occurred in recent years. As a result, more than half of the total accidents were caused either by the bearing failures or leakages due to corrosion⁄deterioration of piping.
Through studying the causes of these accidents, various causes including the lack of aged pipe management, lack of maintenance skill inheritance, skipping or neglectance of maintenance items and lack of communication between operator and maintenance personnel were found.
From 2007, in order to eliminate the cause of the accidents, we made a schedule to reduce these accidents to visualize our activity. And then under this schedule, we surveyed the maintenance and monitoring details of each maintenance area and built up “To-Do List” to work with. “To-Do List” mainly consists of four activities.
Through these activities, in 2013, machine shut down of the pulp plant reduced to 4 times, 20 hours from that of 16 times, 57 hours in 2006. (Reduction of about 70%)
In this paper, activities to reduce equipment accidents are reported along with some illustrative examples.