Study on Re-entrant Flowshop Scheduling Problem(1st report)
Optimization by Mathematical Programming
Rei HINODaisuke UEKAWAMasanori MORIKAWANorikazu SUZUKIEiji SHAMOTO
Author information
JOURNAL FREE ACCESS

2008 Volume 74 Issue 10 Pages 1119-1124

Details
Abstract
A new theoretical formulation for re-entrant flow shop scheduling problem is derived to plan an optimum production schedule by mixed integer programming. Flow time, which is an index of the evaluation of the planned schedule, is minimized to decrease amount of work-in-process. Cycle time, which is another important index, is determined by the total load time on a bottleneck machine to manufacture the products at the highest productivity. Both objective function and constraint conditions are described in linear expressions and a general optimization tool is adopted to solve the formulated scheduling problems. Another objective function is also introduced in order to shorten the time for the optimization. Computational scheduling results obtained by the optimization are evaluated and discussed in the present paper.
Content from these authors
© 2008 The Japan Society for Precision Engineering
Previous article Next article
feedback
Top