A Re-examination of Plant-building Policy in the Petrochemical Industry during Japan’s High-growth Era
Focus on the Enactment of the 300,000-tons per Year Minimum Capacity Standard for Ethylene Plants
Keitaro Nagai
Author information
JOURNAL FREE ACCESS

2020 Volume 55 Issue 2 Pages 27-50

Details
Abstract

This study examines the adoption of minimum capacity standard of 300,000-tons per year (300,000-ton standard) by the Ministry of International Trade and Industry (MITI) for ethylene plants in Japan and resulting cooperative actions by members of the petrochemical industry. In order to strengthen international competitiveness and control investment, MITI enacted a 300,000-ton minimum capacity standard for new ethylene plants in June 1967. However, in 1972, one year before the first oil crisis, there was overcapacity. Many industrial historians have studied the 300,000-ton standard as a cause of this overcapacity from a macro-perspective. However, the capacity adjustment in plant building was made through consultations between MITI and individual companies, sometimes involving the local authority. Thus, this paper examines the effects of MITI’s authorization and the prefectures’ micro adjustments with individual companies from several perspectives. My analysis reveals that MITI’s authorization criteria included not only ensuring stable supplies of raw materials, like naphtha and its derivative products, but also investment profitability, and the prevention of environmental pollution. This result implies that Japan’s industrial policy in the late high-growth era was influenced by a broad range of social and economic problems, not limited to the petrochemical industry.

Content from these authors
© 2020 Business History Society of Japan
Previous article Next article
feedback
Top