2017 Volume 71 Issue 1 Pages 308-314
Recently, global warming is a serious problem. In Japan, therefore, reduction of CO2 emission is an important problem in any industry. Especially, in construction works of which the scale is very large, an action for CO2 emission reduction is demanded, and it is necessary to deal with reduction of CO2 emission. This paper describes the evaluation of concrete property and test-construction of 1DAY PAVE reduced CO2 emission and calculated CO2 emission and compare with 1DAY PAVE reduced CO2 emission with 1DAY PAVE using HC alone. Due to obtain bending strength 3.50N/mm2 which is able to traffic 1day later of construction, 1DAY PAVE was used high strength portland cement and has a lot of unit content of cement than general pavement concrete So, we mixed blast furnace slag cement type B(BB)in 1DAY PAVE, and evaluated concrete property and test-construction was performed. As a result, the bending strength of 1DAY PAVE mixed BB was more than 3.50N/mm2. And 1DAY PAVE mixed BB could be constructed like 1DAY PAVE using HC alone. As for CO2 emission, the emission for 1DAY PAVE reduced CO2 was less than 1DAY PAVE using HC alone, in the case of 50% replacing a part of BB with HC the emission was less 20% than 1DAY PAVE using HC alone.