Abstract
The Chugoku Exway Sabagawa Bridge is perstressed concrete 4 continuous box type of bridge length 150m and cross on the Saba River in Tokuzi Town Yamaguchi Prefectural. This bridge was constructed by the incremental lounching method of Taktschiebe Leonhardt. The report is to describe the design and construction of the Sabagawa Bridge.