Concrete Journal
Online ISSN : 2186-2753
Print ISSN : 0387-1061
ISSN-L : 0387-1061
Crack-Control of Elements for Submerged Tunnels
Tama River and Kawasaki Fairway Tunnels in Expressway Bay-shore Route
S. TezukaS. Tomizawa
Author information
JOURNAL FREE ACCESS

1989 Volume 27 Issue 5 Pages 38-49

Details
Abstract
Tama River and Kawasaki Fairway tunnels in Expressway Bay-shore Route is constructed with submerged tunneling method. As for the elements of these tunnels, eleven of twenty-one elements are now being prefabricated in the dry-dock. This report presents the quality control and crack-control, such as mix proportion and pre-cooling of the concrete, in the prefabrication of the elements.
Content from these authors
© Japan Concrete Institute
Previous article Next article
feedback
Top