Proceedings of the Fuzzy System Symposium
26th Fuzzy System Symposium
Session ID : TB1-4
Conference information

Long-term Operation Planning of District Heating and Cooling Plants Considering Contract Violation Penalties
*Shimpei MatsuokaMasatoshi SakawaHideki KatagiriTakeshi MatsuiKeiichi IshimaruSatoshi Ushiro
Author information
CONFERENCE PROCEEDINGS FREE ACCESS

Details
Abstract

Urban district heating and cooling (DHC) systems operate large freezers, heat exchangers, and boilers to stably and economically supply hot and cold water, steam etc., based on customers demand. We formulate an operation-planning problem as a nonlinear integer programming problem for an actual DHC plant. To reflect actual decision making appropriately, we incorporate contract-violation penalties into the running cost consisting of fuel and arrangements expenses. Since a yearly operation plan is necessary for check whether the minimum gas consumption contract is fulfilled or not, we need to solve long-term operation-planning problems. To fast and approximately solve long-term operation-planning problems, we propose a decomposition approach using coarse (monthly) approximate operation-planning problems.

Content from these authors
© 2010 Japan Society for Fuzzy Theory and Intelligent Informatics
Previous article Next article
feedback
Top