Proceedings of the Fuzzy System Symposium
29th Fuzzy System Symposium
Session ID : MH3-4
Conference information

main
TOC multi-criteria project scheduling problem with a fuzzy assignment of resource and precedence relation
*Xuegang JingZhehua ZhangSangsu Han
Author information
CONFERENCE PROCEEDINGS FREE ACCESS

Details
Abstract

This paper, we try to schedule TOC multipurpose problem with precedence relation and ambiguous resource allocation. The analyzed by DEA method completion time in the stage prior to the introduction of resources, ambiguous cases can be considered, we Precedence relation of work and allocation of resources, corresponding to the degree of satisfaction and satisfaction of each, optimum satisfaction I propose a method to calculate the completion time and degree. As a result, lead to minimization of the maximum completion time in TOC.

Content from these authors
© 2013 Japan Society for Fuzzy Theory and Intelligent Informatics
Previous article Next article
feedback
Top