Abstract
Under the large penetration of photovoltaic systems, the voltage control in a distribution system will contain a difficulty due to the fluctuated reverse power flow, so that the appropriate deployment of voltage regulators is required to suppress the voltage violation. However, derivation of an appropriate long-term deployment plan of voltage regulators is a difficult task because of the uncertainties in spatial-temporal penetration scenario of the photovoltaics systems connected to the distribution system. This paper focuses on a simple approach for deploying step voltage regulators considering uncertainties in penetration transition of photovoltaic systems in order to discuss the necessity of long-term plan. The impact of long-term deployment plans is evaluated by numerical experiments.