2010 Volume 20 Issue 1 Pages 45-48
The commissioning of High Resolution Chopper spectrometer (HRC) constructed in J-PARC, MLF has commenced. The main beam line components are installed and other utilities are equipped. Remaining a couple of preparation, we now get started tunings of machine performance and test experiments.