Journal of Information Processing
Online ISSN : 1882-6652
ISSN-L : 1882-6652
Slot Multiplexing Optimization for Minimizing the Operating Frequency of a FlexRay Bus under Hard Real-time Constraints
Makoto SugiharaAkihito Iwanaga
Author information
JOURNAL FREE ACCESS

2013 Volume 21 Issue 3 Pages 563-571

Details
Abstract

Industrial applications such as automotive ones require a cheap communication mechanism to send out communication messages from node to node by their deadline time. This paper presents a design paradigm in which we optimize slot multiplexing of a FlexRay bus under hard real-time constraints so that we can minimize the operating frequency of the FlexRay bus. The reduction of the operating frequency of a FlexRay bus helps one to choose a slower and cheaper wire harness for building a distributed system. We formulate a slot multiplexing optimization problem under hard real-time constraints. We build an integer linear programming (ILP) model as a means for solving the slot multiplexing optimization problem. Our experimental results show that our design paradigm achieved a 72.7% smaller operating frequency at its best than the naive one.

Content from these authors
© 2013 by the Information Processing Society of Japan
Previous article Next article
feedback
Top