High Productivity Operation at Chiba No. 4 Sinter Plant
Hiroshi ObataHiroyasu TakahashiMasaru NakamuraToshihiko NatsumiKiyoshi Komamura
Author information
JOURNAL OPEN ACCESS

1991 Volume 31 Issue 5 Pages 478-486

Details
Abstract
To meet the demand for increased production, higher productivity has been carried out based on the following targets at Chiba No. 4 Sinter Plant of Kawasaki Steel Corp.:
1) Maintenance of high bed height operation by ensuring stable permeability in the sinter bed,
2) Cost saving sinter production through improvement of sinter yield, and
3) Maintenance of low SiO2 operation.
The following results were obtained from the implementation of various countermeasures.
(1) A highly productive operation of 1.8 t/hm2 without adding any binders.
(2) The total amount of return fine has been decreased from 400–450 to 260–300 kg/t-sinter.
(3) Sinter production cost has been decreased and the minimum cost per unit has shifted to a higher output.
Content from these authors
© The Iron and Steel Institute of Japan

This is an open access article under the terms of the Creative Commons Attribution-NonCommercial-NoDerivs license.
https://creativecommons.org/licenses/by-nc-nd/4.0/
Previous article Next article
feedback
Top