Determining the Impact of Key Climatic Factors on Labor Productivity in the Mongolian Construction Industry
Rentsendorj Usukhbayar, Jongsoo Choi
Author information
JOURNAL FREE ACCESS

2018 Volume 17 Issue 1 Pages 55-62

Details
Abstract
Mongolia is exposed to an inclement-climate environment due to its specific geographical location and altitude. Such circumstances are challenging, and careful consideration is required in terms of the scheduling of construction works; in particular, a high possibility of productivity loss exists regarding outdoor work. This study presents the key climatic factors that significantly impact on the concreting operation, and the historical climatic data, project-specific questionnaire surveys, and the actual productivity data of previous concreting works are accordingly utilized. This study utilized a total of 343 project-specific productivity data collected from the contractors. The analysis results indicate that low temperatures, high winds and precipitation are the critical factors affecting productivity loss in terms of outdoor concrete work. In addition, the authors suggest the critical-factor threshold values for the prevention of this productivity loss, and for the preparation of an optimum project schedule under the inclement-climate condition.
Content from these authors

This article cannot obtain the latest cited-by information.

© 2018 Architectural Institute of Japan
Previous article Next article
feedback
Top