Abstract
The importance of ensuring uninterrupted electric power supply was reaffirmed on the occasion of the Hyogoken-Nanbu Earthquake in 1995, when the district was affected by extended power failure. The notice has been attached to the resistance of power generation facilities to severe earthquake. The seismic proving test of equipment and structures in thermal conventional power plant was conducted.