Journal of the Japanese Association for Petroleum Technology
Online ISSN : 1881-4131
Print ISSN : 0370-9868
ISSN-L : 0370-9868
Autumn meeting “New Challenges for Energy Transportation”
Introduction of drag reducing agent and leak detection system
Takuro Takai
Author information
JOURNAL FREE ACCESS

2008 Volume 73 Issue 2 Pages 152-157

Details
Abstract
The BTC crude oil pipeline runs 1,768 km from the Sangachal Terminal near Baku in Azerbaijan, via Tbilisi in Georgia, through to the Ceyhan Marine Terminal on Turkish Mediterranean coast. The pipeline has started its operation on June 2006 and exported around 220 million barrels as of the end of September 2007.
This presentation introduces the outline of drag reducing agent (DRA) which is currently evaluated for the purpose of increasing the pipeline capacity, and the sophisticated leak detection system (LDS) installed in the system.
Content from these authors
© 2008 The Japanese Association for Petroleum Technology