Abstract
For the purpose of evaluation of numerical site calibration using CFD, the uncertainty analysis of measurements on complex terrain was conducted.
Ichiki Kusikino site are selected for this study. In Ichiki Kushikino site, the measurement campaign carried out in NEDO project.