Abstract
Eco-tube method in a bag filled with sediment and dehydration, and the effective use of soil in the embankment construction materials. The construction of PWRI and developed by private companies, and this method has already been put to practical use. We ability to improve the construction, construction and the development of the system. We fill the river bottom sediment was used as construction materials because of the construction and construction system to report cases.