Geosynthetics Engineering Journal
Online ISSN : 1883-146X
Print ISSN : 1344-6193
ISSN-L : 1344-6193
Papers
PLAN OF GRS INTEGRAL BRIDGE WITH PC GIRDER - GENSHU VIADUCT BRIDGE IN KYUSHU SHINKANSEN (NISHI-KYUSHU ROUTE) -
Akira SAKATATakayuki YAMAZAKIYuske TAKANOKeisuke KIKUCHITaichi TAKASAKI
Author information
JOURNAL FREE ACCESS

2016 Volume 31 Pages 81-

Details
Abstract
The Kyushu Shinkansen (Nishi-Kyushu route) between Takeo-Onsen station and Nagasaki station, 66km in length, is under construction. The Genshu bridge is placed in a valley between tunnels in Isehaya city (47.263km from Takeo-Onsen station). The bridge structure is adopting a GRS integral bridge using a PC girder. Although, in the past, there were cases of GRS integral bridges using a RC girder or a SRC girder. The structure used for the Genshu bridge is the first case for railway infrastructures. This paper presents the initial railway infrastructure project of the GRS integral bridge with the PC girder.
Content from these authors
Previous article Next article
feedback
Top