Geosynthetics Engineering Journal
Online ISSN : 1883-146X
Print ISSN : 1344-6193
ISSN-L : 1344-6193
Long-term Performance of Preloaded and Prestressed Geosynthetic-Reinforced Soil Structure
T. UchimuraF. TatsuokaM. TateyamaT. Koga
Author information
JOURNAL FREE ACCESS

1999 Volume 14 Pages 155-164

Details
Abstract
Vertical preloading and prestressing (PLPS) of geosynthetic-reinforced soil structure aims at substantially increasing its stiffness. The first prototype PLPS reinforced soil pier for a railway was constructed in 1996, and has been opened to service for more than 2 years. Long-term measurements for more than 3 years have been made, and the behavior at train passing was measured just after opening to service and after 2 years of service. The measurement results are described.
Content from these authors
© Japan Chapter of International Geosynthetics Society
Previous article Next article
feedback
Top